Tuesday, 26 December 2017

G & SWR Brake Van Progress

G & SWR Drummond Brake Van interior. 

I've completed the bracing structure on all the interior walls of the van now though the panelled doors are still under construction. The bracing struts are made from 2mm square hollow section brass and there are a lot of them. The floor of the guard's "house" is not part of the kit though the verandah floors are included. I made the inner floor from an etched wagon floor that I had left over from a previous project, this slides into place under the bottom of the inner bracing struts and is supported from below on spacers so it's on the same plane as the verandah floors.  I'll illustrate the underside of the van at a later stage to clarify this.

The doors are not glazed and I have no information on their inner surfaces so I'm panelling them in much the same way as the front. I've made a writing desk for one corner and a locker with a hinged lid for the opposite one. Lookout seats are under construction and the brake mechanism and handwheel will fit into a third corner; the fourth, being of restricted width because of the offset brake end door will remain empty. The kit itself is fairly compliant, it's not fighting back despite not being designed with an interior in mind, though the wheels caught on the underside of the superstructure when I tried them in place today. I cut out slots to ease the problem which would have been an easier task at an earlier stage before I'd half assembled the van.

In a gesture of generosity towards myself, in a moment of levity brought on by the approach of Christmas, I purchased from Andy Copp at Lochgorm Kits a set of etches and castings to build a HR d.24 brake van... so watch this space for details of the build in the New Year.



Interior detailing work in progress, desk and lookout seat in place.

No comments:

Post a Comment