Tuesday, 24 November 2026

HR 45 Progress.


HR 45 is running now on my test track and reasonably well, though I think I can improve on this with a bit of fiddling. The gearbox arrived last week from ABC Gears, it’s fitted with an M1824 motor and a flywheel and fits horizontally inside the boiler powering the rear driving axle. The flywheel protrudes slightly into the cab and is accommodated inside the backhead assembly. Above you can see the phosphor-bronze wire pick-ups bearing on the driving wheel treads which will be hidden inside the side tanks.



The cab interior is taking shape, the spectacle plate has a removable inner skin to which the backhead and other interior fittings will be attached.



A transverse support attached to the side-frames carries the cab steps and allows the step support and the overflow pipe attached beneath the step to be modelled. There’s a lot of weight towards the rear of the engine and though I’ve added weight to the front between the frames, the balance of the loco also relies on the bogie pivot spring which takes some of the burden.


The backhead is built from an etched sheet which has saved time and looks the part. Finding fittings and detailing parts will be. difficult now that Laurie Griffin, my usual source has retired, I’ll have to scratch build a reversing lever and probably a few other details too. Most of the sheet metal work is now complete, apart from the cab rear and bunker, and the roof of course, though they’re all cut out and ready to fit. There’s a wealth of detail to fit to the engine now and this is the next stage. I’ll keep you up to date as work progresses…