Showing posts with label Stroudley Tank. Show all posts
Showing posts with label Stroudley Tank. Show all posts

Wednesday, 12 September 2018

HR56 The Dornoch Tank...Painted

HR56 Drummond II livery 1902-1912


I considered how I was going to overcome the problem of the name "Dornoch" on the tank sides before I even started this project and discovered that the series of names for Highland Railway engines produced by Guilplates included "Gordon Castle", which contains all the letters I needed except the final "H". The missing letter was located on Guilplates' transfer sheet for HR locomotives, which included the wording "Highland Railway" in several different sizes, one of which provided a suitable "H".

The gold lettering of the Highland is shaded in two tones of green and outlined with both black and white, so is not easy to reproduce in miniature. Guilplates design of these letters is somewhat wayward when examined closely, however it is the only option in this case and I think the result is reasonably convincing.

The HR lettering produced by Fox Transfers is not compatible with that of Guilplates, though the Fox transfers are crisply printed they omit the darker green shading which is printed black.




HR56

Cab interior with real coal spilling from the coal hole.


Phoenix Precision paints' P727 Dark Green (1885-1912) was used to represent the Drummond II livery. Floorboards are made from wood strip from a model ship kit. The buff colour of the upper cab sides is Revell matt 82, a useful brown, mixed with white.

The "Archer Surface Details" rivets on the boiler fairing in front of the cab are in evidence in this photo and are I think most effective.


The front spectacle plate can be removed which much simplified painting. The backhead fittings have been left as buffed brass which contrasts with the black backhead plate. 

More resin transfer rivets can just be made out above the rear windows. Builder's plate from Guilplates though barely legible.

Loco lamps from Laurie Griffin, rather undersize, drilled and fitted with a brilliant.

The red loco lamps along with the brightwork and transfers alleviate the austerity of the Drummond II livery.

Wednesday, 9 May 2018

HR56 Dornoch, progress

A coal bunker was added in 1910 with a coal-hole in the cab.  


The original bunker of HR56, which was in front of the cab spectacle plate, was sheeted over and a hand rail added to match that on the other side when a rear bunker was added in 1910. The new coal bunker replaced the tool box behind the cab and photographs suggest that at this time the rectangular rear cab windows were remodelled rather smaller and square, similar to those at the front and a mesh screen was added to protect the glazing. In addition a coal-hole was added which I've given an elegant vertical sliding door similar to that seen in Stroudley's later Terriers, which he designed for the LB&SCR

There is a 2" gap between the front saddle tank and the original bunker which is not evident on the other two HR Stroudley tanks, only Dornoch displays this. A fairing, on which the dome is mounted, covers the boiler in front of the cab and partly covers the gap. There is an outer and an inner cab front between which the glazing will be sandwiched. The boiler backhead, which for want of information, takes as its model that of the related Stroudley Terriers, is mounted on the inner sheet and this assembly will be removable.


HR56 showing progress to date, chimney and dome from LGM.


My intention is to complete the sheet metal work first and then add the castings and fine detail. The cab is still joined to the bunker assembly by a structural device which ensures accuracy of construction, this will be removed when the structure is complete, before the cab stanchions are put in place. The buffer beam on these engines was a sandwich of metal plates with a wood filling which I hope to replicate. I intend to experiment with Milliput coloured with weathering pigment, to simulate the wooden part as I find real wood, box in this case, hard to work and rather toy-like in appearance.

The frames of the engine are 27mm wide and are cut short just beyond the front driving wheels. The frames are visible in the gap in the footplate between the smokebox and the buffer beam, so they are modelled full scale (actually 29.5mm) and attached to the footplate behind the buffer beam so they fit over the working frames. The join between the dummy front frames and the working frames will not be visible as the front brakes cover it. The smokebox front plate extends below the buffer beam to the cylinder covers so there's a lot of detail in this area and I intend to maximise its potential...

Saturday, 7 April 2018

Klondike brake van in action.

 HR Klondike brake van at CDOGG
Stroudley Tank and Klondike brake van in the scenic section of the CDOGG layout.


Hauled by Highland Railway Stroudley 0-6-0T number 57 "Lochgorm" my newly completed Klondike brake van was in action today on the Carlisle club layout and a very fine pair they looked together.